Khobar to dammam university water transmission system wts
The scope of work in this work order shall include but not limited to all piping works starting from transporting of pipes from Raymond factory. spool fabrication, bend fabrication, pipeline erection, pipe supports installation, welding works, coating of girth weld joints including (NDT, hydro test, pneumatic test if required) of the piping and fitting at Khobar Dammam university Project site. Subcontractor should provide all consumables, equipment, tools required to complete the work, including proper site supervisors. safety, testing and specialists pre-qualified and certified by Client/Contractor with warranty in accordance with Client requirements, specification and standards without any deviation and subject to Project Client approval and acceptance
Material: Carbon Steel (CSx65) – Diameter: 80 inch – Spool length: 17.9 meter – Thickness: 15.88 mm – Weight: 180 kg (per linear meter)
Project Details
CLIENT
SWCC
PROJECT CATEGORY
CONTRACT TYPE
Subcontractor (HEMI-SSEM-Q2412021)
Area
Western
MAIN CONTRACTOR
Saudi Service for Electro Mechanic Works CO (SSEM)