The scope of work in this project included all piping works starting from spool fabrication, bend fabrication, pipeline erection, Pipe supports installation, welding works including hydro Test of the piping and fitting at Energy industrial city feeder Project site.

It is a pipeline to carry water from the main station of Al-Khobar City to Abqaiq City to Aramco.

Material: Carbon Steel(cs.x42) – Diameter: 700mm (28 inch) – Thickness: 6,35mm – Spool length: 11,8 meter – Weight: 110.37 kg (per linear meter) – Total length: 60 KM (15 KM / month)

Project Details

CLIENT

SWCC

PROJECT CATEGORY
CONTRACT TYPE

subcontractor (HEMI-SSEM-PLW-20190902)

Area

Eastern

MAIN CONTRACTOR

Saudi Service for Electro Mechanic Works CO (SSEM)

PROJECT STATUS

Completed