Berri Onshore Flow Lines & Tie-in – 1580 Mechanical RTR Pipeline Installation

Do You Have A Project We Can Help With

لديك مشروع و ترغب أن نساعدك به

Connect with us
تواصل معنا

Berri Onshore Flow Lines & Tie-in – 1580 Mechanical RTR Pipeline Installation

Whereas we carry out all the works for this line, Adhesive jointing & Lamination jointing, Lowering & closing the pipes by end cap, installation inside sleeves, crossing installation, spacers & end seal (supply & installation), and Hydro testing as per Aramco procedure

HEMI CO provided all consumables, equipment’s required to complete the work, including proper site supervisors, safety, testing and specialists as pre-qualified and certified by Client/Contractor and warranty in accordance with Client requirements, specification and standards without any deviation and subjected to Project Client approval and acceptance.

Pipeline length: 16 KM – Diameter: 36 inches – Material: RTR Pips – Spool length: 15 km – Thickness: 6 mm – Weight: 2.5 ton

Project Details

CLIENT

Saudi Arabian oil company (Saudi Aramco)

PROJECT CATEGORY
CONTRACT TYPE

Subcontractor (HEMI-RTCC. 50301/60) dated 09-11/2020

Area

Eastern

MAIN CONTRACTOR

al Rashid trading & contracting co. (RTCC)

PROJECT STATUS

Completed

Project Gallery