CONSTRUCTION OF QUNFUDAH NEW CITY FEEDER WATER TRANSMISSION SYSTEM. Pump Station
Do You Have A Project We Can Help With
لديك مشروع و ترغب أن نساعدك به
Construction of qunfudah new city feeder water transmission system. Pump station
The scope of work in this work order shall include but not limited to all piping works starting from transporting of pipes from Storage yard, spool fabrication, bend fabrication, pipeline erection, pipe supports installation, welding works, External Coating type heat shrinkable sleeve of girth weld joints including (NDT, hydro test, pneumatic test if required) of the piping and fitting at QUNFUDAH Project site. Subcontractor should provide all consumables, equipment, tools required to complete the work, including proper site supervisors, safety, testing and specialists pre-qualified and certified by Client/Contractor with warranty in accordance with Client requirements, specification, and standards without any deviation and subject to Project Client approval and acceptance
Pumping rate : 1000 m3 / H – Tank capacity : 30,000 m3 – Pipeline length : 16 KM- Diameter: (6,8,12,14,16,24,26,36,40,44) inches – Material: Carbon Steel – Spool length: Mix – Thickness: Mix – Weight: Mix
Project Details
CLIENT
SWCC
PROJECT CATEGORY
CONTRACT TYPE
Subcontractor (HEMI-SSEM-Q27032021) dated 27-03-2021
Area
Western
MAIN CONTRACTOR
Saudi service for electro mechanic works co (SSEM)
PROJECT STATUS
Still Running