Berri Onshore Flow Lines & Tie-in – 1580 Mechanical RTR Pipeline Installation
Do You Have A Project We Can Help With
لديك مشروع و ترغب أن نساعدك به
Berri Onshore Flow Lines & Tie-in – 1580 Mechanical RTR Pipeline Installation
Whereas we carry out all the works for this line, Adhesive jointing & Lamination jointing, Lowering & closing the pipes by end cap, installation inside sleeves, crossing installation, spacers & end seal (supply & installation), and Hydro testing as per Aramco procedure
HEMI CO provided all consumables, equipment’s required to complete the work, including proper site supervisors, safety, testing and specialists as pre-qualified and certified by Client/Contractor and warranty in accordance with Client requirements, specification and standards without any deviation and subjected to Project Client approval and acceptance.
Pipeline length: 16 KM – Diameter: 36 inches – Material: RTR Pips – Spool length: 15 km – Thickness: 6 mm – Weight: 2.5 ton
Project Details
CLIENT
Saudi Arabian oil company (Saudi Aramco)
PROJECT CATEGORY
CONTRACT TYPE
Subcontractor (HEMI-RTCC. 50301/60) dated 09-11/2020
Area
Eastern
MAIN CONTRACTOR
al Rashid trading & contracting co. (RTCC)
PROJECT STATUS
Completed