The scope of work in this project included all piping works starting from spool fabrication, bend fabrication, pipeline erection, Pipe supports installation, welding works including hydro Test of the piping and fitting at Energy industrial city feeder Project site.
It is a pipeline to carry water from the main station of Al-Khobar City to Abqaiq City to Aramco.
Material: Carbon Steel(cs.x42) – Diameter: 700mm (28 inch) – Thickness: 6,35mm – Spool length: 11,8 meter – Weight: 110.37 kg (per linear meter) – Total length: 60 KM (15 KM / month)
Project Details
CLIENT
SWCC
PROJECT CATEGORY
CONTRACT TYPE
subcontractor (HEMI-SSEM-PLW-20190902)
Area
Eastern
MAIN CONTRACTOR
Saudi Service for Electro Mechanic Works CO (SSEM)
PROJECT STATUS
Completed